Usage
Welfare
Shetland Islands
The firm contacted Rubb looking for a solution to provide 3,800 site employees with accessible facilities where they can relax and recharge.
The 9.1m span x 18.9m long RDS shelter has been designed for rapid deployment and erection using a minimum workforce and without the aid of mechanical handling equipment. The shelters provided can be easily connected together using access links. These can be incorporated into the gable ends and the sidewalls of other buildings.
The building features Rubb’s standard galvanized steel frame covered in light grey PVC. This particular shelter was designed to suit the high wind loads of the Shetland Islands. As the project developed, Rubb worked very closely with Petrofac to adapt the design to best suit requirements and this proved very successful.
Fill out this form, and a member of the Rubb team will be in touch.
info@rubbusa.com