Port of Philadelphia
Arrow down

Port of Philadelphia

Philadelphia, Pennsylvania

Arrow down

Rubb provides third fabric warehouse for PhilaPort, improving its position as a leading US port.

When PhilaPort needed to expand dry storage capacity at the Tioga Marine Terminal, their positive experience with Rubb high-quality membrane structures over the past 20+ years encouraged them to utilize another.  The initial planning for this project began in 2016, with procurement taking place in mid-2019.  After careful coordination and cooperation, the project was completed ontime, in early 2020.   

The BVE series Rubb building is 150’ wide by 666’ long with a sidewall height of 26.2’, providing nearly 100,000 sf of premium storage spaceThe Rubb building is comprised of hot-dip galvanized steel frame covered with a singlelayer architectural PVC membrane.  The project’s general contractor outfitted the structure with multiple bays of loading dock equipment, access doors, complete lighting, and related systems.  A Rubb factory technician aided in the construction of the Rubb building. 

Rubb has been serving the US marketplace for 37 years since 1983 from its manufacturing facility in Sanford, Maine. The company was originally founded in Norway in the mid 1960s and has operations around the world.  

Request info

Fill out the form below and a member of the Rubb team will be in touch.
Opt In