petrochemical welfare facility
Arrow down

Petrochemical Welfare Facilities

Western Pennsylvania

Arrow down
petrochemical welfare facility

Rubb Building Systems serves up a place to meet and eat.

Rubb USA was hired to design, fabricate and erect eleven 30.5m (100ft) x 37.2m (122ft) x 3m (9.8ft) BVEs. The fabric structures will provide meeting areas and lunchroom facilities for site workers, estimated to reach 6,000 during peak construction.

The Western Pennsylvania plant, once operational, will be one of the largest petro-chemical facilities in the world. Rubb crews have been ‘on campus’ at the site since May 2016 and the 11 structures were completed by December 2016.

Each building is equipped with a heating and ventilation system along with a stateof- the-art LED lighting system, all of which were supplied and installed by Rubb. All the buildings are insulated with Rubb’s patented Thermohall® insulation. Many thanks go out to the hardworking, diligent crew who have spent considerable time away from home.

Request info

Fill out the form below and a member of the Rubb team will be in touch.
Opt In