Fisher Engineering Packaging Warehouse

Rockland, Maine

Arrow down
fisher engineering packaging warehouse external

When Fisher Engineering needed to add fabrication space to their facility, they turned to Rubb.

Their solution was to move packaging warehousing in their main facility to a new Rubb warehouse.

The Rubb structure’s flexible foundation capability allowed the 15,000 square foot warehouse to be erected on the existing paved storage area with virtually no additional site work. Rubb’s relocatable wide flange foundation beam system was designed to accommodate the uneven site and the structure base was sealed to the weather with an economical asphalt berm around the structure perimeter.

This fully functional warehouse facility was erected at a fraction of the cost and far more quickly than other alternatives.