Fisher Engineering Packaging Warehouse

Rockland, Maine

When Fisher Engineering, manufacturer of the renowned Fisher Plow, needed to add fabrication space to their Rockland, Maine facility, they turned to Rubb. Their solution was to move packaging warehousing in their main facility to a new Rubb warehouse.

 

The Rubb structure’s flexible foundation capability allowed the 15,000 square foot warehouse to be erected on the existing paved storage area with virtually no additional site work. Rubb’s relocatable wide flange foundation beam system was designed to accommodate the uneven site and the structure base was sealed to the weather with an economical asphalt berm around the structure perimeter.

 

This fully functional warehouse facility was erected at a fraction of the cost and far more quickly than other alternatives.

Building Specifications

Usage

Usage

Manufacturing

Usage

Type

BVE

Span

Span

98.43 ft

Usage

Length

150.92 ft

Call Rubb

CONTACT RUBB

Contact the Rubb team with your building requirements. We are here to support you throughout your project.

Rubb brochures

VIEW BROCHURE

Explore the latest Rubb storage brochure. This brochure features the latest projects and structure information.