Norwegian Defence Logistic Organization (FLO) Meymaneh, Faryab, Afghanistan Military Project
Project Type:
Military
Client:
Norwegian Defence Logistic Organization (FLO)
Location:
Meymaneh, Faryab, Afghanistan
Rubb delivered 2 maintenance buildings 12m x 21m. These two buildings were assembled at Meymaneh by Hallmaker-Rubb personnel.
SPECIFICATIONS
Span:
12.00 m (39.37 ft)
Length:
21.00 m (68.9 ft)
Frame:
Hot Dip Galvanized
Fabric:
Thermohall
Lighting:
Yes
Heating:
Yes
Additional Features:
Design loads: 2 kN/m2 snow load, 1 kN/m2 wind load. Doors: 2.5m overhead doors. Insulation: “Thermohall” membrane 10 cm , U-value 0.4. Heating: electric radiators. Lighting and power: fluorescent lamps 300 lux, power distribution, fire/smoke detection system. Docking stations: 4 each side wall openings for standard container connection to hangar. 100 kW containerized air-condition / ventilation units.