Petrochemical Welfare Facilities

Rubb Building Systems serves up a place to meet and eat

 

Rubb USA was hired to design, fabricate and erect eleven 30.5m (100ft) x 37.2m (122ft) x 3m (9.8ft) BVEs. The fabric structures will provide meeting areas and lunchroom facilities for site workers, estimated to reach 6,000 during peak construction.

 

The Western Pennsylvania plant, once operational, will be one of the largest petro-chemical facilities in the world. Rubb crews have been ‘on campus’ at the site since May 2016 and the 11 structures were completed by December 2016.

 

Each building is equipped with a heating and ventilation system along with a stateof- the-art LED lighting system, all of which were supplied and installed by Rubb. All the buildings are insulated with Rubb’s patented Thermohall® insulation. Many thanks go out to the hardworking, diligent crew who have spent considerable time away from home.

Building Specifications

Usage

Usage

Welfare

Usage

Type

BVE

Span

Span

100ft

Usage

Length

122ft

Usage

Eaves

9.8ft

Usage

Door

RSD

Usage

Completed

2016

Call Rubb

CONTACT THE TEAM

Contact the Rubb team with your structure requirements. We are here to support you throughout your project.

Rubb brochures

VIEW BROCHURE

Explore the latest Rubb ENERGY brochure. This brochure features the latest projects and structure information.