June 2nd, 2008 by GlenThis was a slow week of construction as the axial steel and cables were fitted in between the standing leg trusses.
A few roof spans were also assembled on the ground in preparation for next week’s crane lifting. This week’s video shows the leg longitudinal tubes and leg bend d-frames fitted into place.