Rubb BVE Range Structure Transport
June 9th, 2009 by RubbRubb Inc. recently observed the lift and transport of a Rubb BVE range structure. East Coast construction firm, Cianbro Inc., needed to move the Rubb building from a site in South Portland to one in Portland, Maine. A mobile crane moved the 10-ton building across a construction yard and a floating crane lifted the building onto a barge platform. The barge and accompanying building then crossed the ½ mile wide Fore River to the Portland site. The lift and transport of the building finished in roughly four hours.


