Rubb Fabric Building News

Rubb Poland Konin

July 31st, 2009 by Rubb

Rubb Poland Konin
View Larger Image

The above 10m x 24m THA was manufactured by Rubb Poland in the city of Konin. While structurally it is comparable with a standard THA shelter, it has been outfitted with wheels allowing for easy on-site moving of the structure.


Video of Wallops MLAS Launch

July 8th, 2009 by Glen

This morning the Max Launch Abort System (MLAS) test vehicle was successfully fired off at the Wallops Flight Facility in Virginia.  As reported in this blog, Rubb supplied the structure that kept the launch pad under cover while the MLAS was being readied.  In the video above, you can see the white Rubb building in the foreground at the time of launch, about 2:04 minutes into the video.  Photographs of the launch are viewable here.


Taunton Vale Sports Club Receives Indoor Sports Hall

June 15th, 2009 by Rubb

Taunton Vale Sports Club

Last autumn, Rubb Buildings Ltd manufactured and delivered a high tech Indoor Sports Hall for Taunton Vale Sports Club. The contract was awarded from tender, and included a 24m Span x 38m Long x 8m sidewall indoor sports hall.

The Rubb Building included an inner-skin and insulation package, steel clad sidewalls (3m high), sports rebound boards both fixed and removable, a high class lighting system providing 750lux, a ventilation system and a Gas fired Ambi-rad heating system.

The building has been designed around the specifications for indoor courts as stipulated by England Netball. However Rubb also used their design expertise, to ensure that the Sports hall may be used for other sports such as Badminton, Basketball, Soccer, and Hockey.

Learn more about our sports buildings


Rubb BVE Range Structure Transport

June 9th, 2009 by Rubb

Rubb BVE Range Structure Transport
Click image to enlarge

Rubb Inc. recently observed the lift and transport of a Rubb BVE range structure. East Coast construction firm, Cianbro Inc., needed to move the Rubb building from a site in South Portland to one in Portland, Maine. A mobile crane moved the 10-ton building across a construction yard and a floating crane lifted the building onto a barge platform. The barge and accompanying building then crossed the ½ mile wide Fore River to the Portland site. The lift and transport of the building finished in roughly four hours.


New Construction Facility for Terje Haugland Entreprenør AS

June 4th, 2009 by Rubb

Terje Haugland Entreprenør ASTerje Haugland Entreprenør AS RVTerje Haugland Entreprenør AS Ceiling
Click any image to enlarge

The above NV 10X12 Rubbhall was recently delivered to Terje Haugland Entreprenør AS. This is a construction company and the building is supposed to house various construction equipment. The Rubbhall was supplied with a steel folding door, lighting, fans and dehumidifier.

One of Rubb Hall AS’ goals is to be able to supply customers in Norway a full turn-key service and we are finding that more and more customers with to have dehumidifiers installed as opposed to heating. This saves on energy costs and naturally prevents any condensation.


Rubb Statement on Dallas Cowboys Practice Facility Collapse

May 11th, 2009 by David Nickerson

To those in the Dallas Cowboys community we express our heartfelt concern and sympathy after the tragic events which occurred at the team’s Irving, Texas practice facility on May 2nd. Such events, although extremely rare, are a sobering reminder as to how precious life is and how quickly a tragedy like this can unfold with devastating and lasting consequences.

Over the past days we have received a number of calls and other contacts from current and prospective Rubb customers and other Rubb stakeholders regarding this matter. This statement is intended to address the concerns of our customers and stakeholders:

First, despite various inaccurate reports in the media, the structure involved was a membrane-clad, steel frame supported structure. However the structure was not one of our products.

Second, it is too early to definitively know what caused this tragic collapse and no rush to judgment should be made.

What we do know is that there are significant differences in materials and methods between the various suppliers in the membrane-covered structures industry. We also know that while failures of this magnitude are virtually unprecedented, what we learn in the coming months will give us all the opportunity to learn how to prevent a recurrence.

For our many customers who have expressed concern regarding their existing Rubb structures and their ability to withstand a significant weather event, let us assure you of one thing: our building range products are properly engineered to code standards, they are structurally sound and they are constructed with properly certified and proven, quality materials.

In light of the tragedy, we have added a page describing the standards of quality that all Rubb building range products share. It also highlights the experience of our company and some of the features which we believe make the Rubb product one of the safest and best built structure products in the marketplace.

In closing, please do not hesitate to contact me with any questions or concerns.

Sincerely,
David C. Nickerson
President, Rubb, Inc.

1-800-289-7822


Rubb hosts University of Virginia Architecture students

February 26th, 2009 by Glen

UV Architecture 2009For the third year in a row, Rubb Inc. has hosted a group of students from the University of Virginia School of ArchitectureProfessor Earl Mark arranges to have his Maine Coast Lightweight Structures Studio class visit the Rubb facility as one of the many stops during their trip to Maine.  Although the specific course details change from year to year, the general premise is to have the students develop concepts for portable structures that have a low ecological footprint.

While at Rubb, they toured the PVC fabrication and steel welding shops, and looked at design details of large and small Rubb structures.  We also studied a myriad of fabric attachment methods and discussed ways to make buildings mobile.  The students asked a lot of great questions that were directly relevant to their project. I wish them great success in their class, and look forward to seeing their final presentations. I also can’t wait to see the next class in 2010!


Rubb Exhibits At ProMat 2009

November 7th, 2008 by Gordon Collins

Rubb Buildings will be an exhibitor at ProMat 2009 (Booth 105) sponsored by The Material Handling Industry of America at the McCormick Place South Convention Center in Chicago, Illinois, USA. The trade show runs from January 12-15. 2009.

ProMat 2009 focuses on the productivity solutions provided by material handling and logistics. The four-day event will be the most comprehensive showcase of material handling and logistics equipment, systems and technologies in the United States in 2009. The show is designed to offer productivity solutions and information by showcasing the products and services of over 800 material handling and logistics providers.

The U.S. Department of Commerce has selected ProMat® 2009 for the ninth time for its prestigious International Buyer Program. The Program provides Matchmaker services for interested buyers and sellers though an International Business Center located at the event. International trade specialist will be on hand to provide expert counseling.


Rubb at AAPA Trade Show in Anchorage, Alaska

September 16th, 2008 by Gordon Collins

aapa logo
Rubb Buildings will be an exhibitor at the 97th Annual Convention of the American Association of Port Authorities (Booth 17) in Anchorage, Alaska. The convention runs from September 21-25, 2008.

The week-long convention includes technical and policy committee meetings, business sessions and social events allowing port professionals and others in the marine transportation industry to exchange views.

The Rubb Group has more building area under roof in ports throughout the world than in any other market, and this is a chance to show the unique attributes of these structures to port authorities in the western hemisphere.


Rubb, Inc. New Welding Shop Construction – Week 10

July 31st, 2008 by Glen

With the fabric sheets laced together, the next step is to heat seal the PVC over the seams. This effectively turns the building membrane into a continuous, watertight shell enclosing the entire structure. This week’s video shows the crew working up and down the seams, sealing them shut with a hot-air gun. They also start sealing the flap down the ridge of the building.

At this point, the bulk of the work is taking place inside the structure, as they prepare the floor for the radiant heat pipes and install the steel in the gable ends. With the membrane in place, we won’t be able to see much activity on the time-lapse camera for a while. I will still post weekly updates as construction progresses.
 
 
 


Rubb, Inc. HomeRubb, Inc. Site MapFollow Rubb, Inc. on FacebookView Rubb, Inc. Videos on YouTube