September 21st, 2010 by Rubb
The experts at Rubb Buildings Ltd held the key to designing a new door for a hangar at RAF Waddington.
The 20m x 33m NV type building was originally manufactured with a Fast Jet Door to house various aircraft. This style of door required three men on the ground and the pilot to move the aircraft in and out of the hangar.


View Larger Image(s)
Then Rubb came up with a plan to reduce the ground staff to just one man. This involved designing and equipping the facility at the UK base with a bespoke 17.5m x 6m sliding door. The new door is fully insulated in keeping with the insulated building which features an inner skin, electrical kit and heating. The project was completed on May 6, 2010.
July 23rd, 2010 by Rubb
Rubb AS has recently erected a Type FX building measuring 12m wide x 46m long with 6m sidewall for Caam AS. This is a property company that rents out the building to Itella Logsitics AS. They use the Rubb Building for general storage and distribution.
This building is insulated with the patented Rubb "Thermohall" technology to provide an environmentally friendly building. Rubb has supplied the structure with three motorized doors (2.97m x 3.7m) with integrated personnel doors. The building was also supplied with lights and an internal partition wall.
April 16th, 2010 by Rubb

Click image to enlarge
Lillebø Sand & Transport is a company based in Oltedalen, Ålgård in Gjesdal Kommune in Norway. Rubb Hall AS have supplied a Rubbhall (type NV) which is 12m wide x 26m long with 4m side wall. Rubb supplied two 5m x 5m doors, one in each end. These are standard steel “Rubb doors” which we have designed and manufactured. These are robust folding doors that require very little maintenance. Lilleby Sand & Transport supply large quantities of sand and stone to the concrete industry in Rogaland (South West coast of Norway). They have a further two such facilities in the area. The Rubb building is used to dry sand before it is used for making concrete.
April 2nd, 2010 by Rubb

Click image to enlarge
Rubb has supplied a NV type Rubbhall 15m wide x 26m long with 4m side wall to Alutec AS in Os, just outside Bergen, Norway. Alutec AS is a large producer of floating docks and JAMAX scaffolding for the building industry. The JAMAX system is one of the most used scaffolding systems in Norway. The Rubb building was supplied with 2 4m x 5m overhead doors and one personnel door. Rubb also supplied (5) 400 watt light fittings and (2) Relivent internal fans. This is to reduce any condensation in the building.